Pollock Road closed until May 17

GRAND BLANC TWP. — Pollock Road at the proposed Dort Highway intersection will be closed until Monday, May 17.

The Genesee County Road Commission’s contractor was scheduled to close the intersection, located between Timberline Drive and Health Park Blvd., on Wednesday, May 5, for roadway intersection construction.

All Ascension Genesys hospital campus parking lots will be accessible and open.

The Pollock Road/Dort Highway intersection construction is part of the South Dort Highway Extension – South Phase project.

Traffic will be detoured to McWain, Baldwin, Cook and Holly roads.

Motorists are advised to allow extra time to reach their destinations. — L.R.