Stage 3 of the Bristol Road Bridge replacement is underway



FLINT TWP. — The Genesee County Road Commission began replacement of Bristol Road Bridge over Call Drain, between Torrey Road and I-75, in Flint Township on Aug. 23.

Phase 3 of the project began Oct. 6. A traffic shift on Bristol Road will provide one eastbound and one westbound lane. The eastbound Bristol Road entrance ramp to southbound I-75 will be closed.

Motorists are advised to follow the signed detour route along eastbound Bristol Road through the Roundabout to westbound Bristol Road and southbound I-75 entrance ramp.

The anticipated open to traffic date is Nov. 30. — G.G.


Leave a Reply

Your email address will not be published. Required fields are marked *